Skip to content
Shed Cut List

Style Bundle

The Style Bundle builds every size this site supports in the one roof style you pick: gable across all six sizes (8x8 through 12x16), or lean-to across the three sizes it fits (8x8, 8x10, 10x10).

Pick your roof style and door at checkout. The download is one combined ZIP: a start-here page listing every size included, a single cut-list PDF with every size's boards packed and labeled by size, a panel-layout PDF broken out by siding, floor decking, roof sheathing and door panel for every size, a combined assembly order, a bill of materials in JSON keyed by size, and an editable-price shopping-list spreadsheet with one sheet per size.

This is the plan to buy if you know your roof style but have not settled on a footprint yet, or if you are quoting a build across a few sizes for the same client or yard. If you want a fixed size now, the Parametric Shed Plan is cheaper; if you want both roof styles across every size, the Complete Bundle covers everything.

Who buys a style bundle

Two cases, mostly. Someone deciding between sizes who wants the cut lists side by side before committing lumber money, and anyone building for other people, where the same roof detail repeated across sizes is worth more than one plan drawn once. Having all six gable sizes in hand also makes it painless to move up a size late, which happens more often than moving down.

What the combined download contains

One ZIP with a start-here page listing every plan inside, then the full plan set for each size: cut list, panel layout, dimensioned views, assembly order, bill of materials and shopping list. The door option you pick at checkout applies across the bundle, and each plan stands alone, so you can print only the size you are building today.

Price

$49 once against $29 for a single plan, which pays for itself the moment a second size is drawn. If you want both roof styles, the Complete Bundle collects all nine plans for $79.

Field procedure for using the bundle without mixing sizes

Start by making a separate job folder for each footprint before you print anything. Use the size as the first part of the folder name, for example 8x10, 10x12 or 12x16. Put the cut list, panel layout and shopping sheet for that one size in the same folder, then print only those pages for the build. Do not carry the full bundle to the saw station.

Mark every printed page with the build size in heavy pencil at the top right corner. If two people are cutting, one person should read from the cut list and one person should write the count actually cut. This takes about 20 to 30 minutes on a small shed and about 45 minutes on a 12x16, but it prevents most duplicate cuts.

Buy and stage lumber by length first, then by use. Keep floor framing, wall framing, roof framing and trim in separate piles. If a board length appears in more than one assembly, do not cut the shorter parts first. Cut the longest required parts from each stock length, then use the offcuts for blocking, cripples or shorter pieces if the cut list allows it.

Before fastening any wall, dry lay the bottom plates and top plates on the deck and check that the total length matches the selected footprint. A 1/8 inch error at a plate joint can usually be corrected while framing. A 1/2 inch error should be corrected before the wall is raised.

Equipment, working space and figures to plan around

A basic build station needs a circular saw or miter saw, drill or impact driver, tape measure, framing square, chalk line, pencil, clamps, sawhorses and a flat place to stack sheet goods. A 25 foot tape is enough for all listed footprints, but a 16 foot tape is inconvenient on the longer floors and roof panels. Use two sawhorses for short stock and three supports for long boards so the cut does not close on the blade.

Set up a flat sorting area before delivery. Sheet goods are easiest to handle when stacked on stickers about 16 inches apart, not directly on wet ground. Leave at least 3 feet of walking space on the side where sheets are lifted. If the shed is larger than 10x12, plan for two people when moving full panels, especially in wind.

Footprint being checkedMinimum clear deck checkUseful work zone around the buildTypical print set to keep at the bench
8x8Both diagonals should match before walls go up.About 14x14 feet gives room for panels and a saw stand.Cut list, floor layout, wall pages and roof pages.
8x10 or 10x10Check square after the floor frame and again after decking.About 16x18 feet is workable for one cutter and one assembler.Same as above, with the panel layout kept clean for reference.
10x12 or 12x12Recheck crown direction and plate length before wall assembly.About 18x20 feet reduces sheet handling problems.Keep roof framing pages separate from wall pages.
12x16Measure both long walls before sheathing locks the frame.About 20x26 feet is a practical minimum for cutting and staging.Use a clipboard for each assembly stage.

If you only need one fixed footprint, compare the single plan option first on the plans page. The bundle is most useful when the same roof style is being compared across several sizes.

Frequent mistakes and how to recover

Mixing two sizes in the same cut pile. Stop cutting and sort every marked piece by length and assembly. Compare the count against the printed list for the size you are building. Do not assume that a board cut for one footprint can be moved to another footprint unless the length and use both match.

Cutting panels before confirming the frame is square. Panels depend on the frame being straight and square. If a floor or wall is out of square, correct the frame first by pulling diagonals equal, then fasten temporary bracing. Trim a panel only after the frame has been checked, because trimming the panel to fit a bad frame can move the error into the roof or door opening.

Using the shopping sheet as a cut order. The shopping sheet is for buying and pricing. The cut list is the document to use at the saw. If material is already cut from the shopping sheet alone, measure every piece and write the actual size on it. Then match those pieces to the cut list before cutting more stock.

Changing the footprint after lumber is bought. First compare the larger and smaller size lists, not just the floor area. Longer plates, rafters and sheet layouts may change even when the shed looks similar. Keep uncut stock full length until the final size is chosen.

Special cases to decide before printing

If the site is tight, print the panel layout early and mark the direction sheets will be carried from the stack to the shed. Turning a full sheet in a narrow side yard can require more space than fastening it. A gate opening of about 48 inches is much easier than a 36 inch opening for sheet handling.

If the shed will be built over several weekends, store printed pages in stage order: floor, walls, roof, panels and door. Put the current stage in a clear sleeve or under a scrap of transparent plastic. Wet paper and sawdust make cut marks hard to read, and a smudged number is a common cause of wrong length cuts.

  • For a one person build, pre cut only one assembly at a time so parts are not moved repeatedly.
  • For a two person build, let one person control the drawings and measurements while the other cuts and labels.
  • For a client quote, price each size from its own sheet and keep labor assumptions separate from material totals.
  • For download or printing questions, check the FAQ before reorganizing the files.

One-time payment via Stripe, no subscription. Your plan is generated from the options chosen here immediately after payment.

Read next

  • About Shed Cut List: Shed Cut List is built and run by WEABLE SAS.
  • Your files: Access your purchased Shed Cut List downloads here.
  • Free 8x8 Lean-To Shed Plan: Free complete 8x8 lean-to shed plan: dimensioned views, cut list packed onto stock lumber, panel layout, assembly order and bill of materials, no cost.
Your order

Your order

Digital content: a ZIP archive with the plan set generated from your choices. One-time payment, delivered immediately after payment.

Sold by WEABLE SAS. Secure payment via Stripe.